购买云解压PDF图书

当前位置: 土木工程专业英语 > 购买云解压PDF图书
土木工程专业英语
  • 作 者:宇德明主编
  • 出 版 社:长沙:中南大学出版社
  • 出版年份:2014
  • ISBN:9787548711933
  • 注意:在使用云解压之前,请认真核对实际PDF页数与内容!

在线云解压

价格(点数)

购买连接

说明

转为PDF格式

9

立即购买

(在线云解压服务)

云解压服务说明

1、本站所有的云解压默认都是转为PDF格式,该格式图书只能阅读和打印,不能再次编辑。

云解压下载及付费说明

1、所有的电子图书云解压均转换为PDF格式,支持电脑、手机、平板等各类电子设备阅读;可以任意拷贝文件到不同的阅读设备里进行阅读。

2、云解压在提交订单后一般半小时内处理完成,最晚48小时内处理完成。(非工作日购买会延迟)

Chapter 1 Spread footings and driven pile foundations 1

1.1 Spread footings 1

1.2 Driven piles 2

1.3 Factors to be considered in selecting piles 5

Chapter 2 Flexible pavements 8

2.1 Conventional flexible pavements 8

2.2 Full-depth asphalt pavements 10

2.3 Contained rock asphalt mats 11

Chapter 3 The railway cross section 14

3.1 Ballast 14

3.2 Crossties or sleepers 15

3.3 Rails 16

3.4 Tie plates 16

3.5 Fastenings 17

3.6 Rail anchors 17

3.7 Rail ioints 17

Chapter 4 New Austrian tunneling method 21

4.1 Introduction 21

4.2 Historical aspects of NATM 21

4.3 General concepts of NATM 22

4.4 Scope of application of NATM 24

4.5 Concluding remarks 25

Chapter 5 The Analysis of Controlled Deformations(ADECO)and its advantages 28

5.1 ADECO approach 28

5.2 Advantages of the ADECO approach over sequential excavation and NATM 31

5.3 Conelusions 32

Chapter 6 Productive modeling for development of as-built BIM of existing indoor structures 37

6.1 Introduction 37

6.2 Conventional methods 38

6.3 Proposed approach 40

6.4 Experiments and results 41

6.5 Conclusions 47

Chapter 7 Technology development in construction:a continuum from distant past into the future 52

7.1 Introduction 52

7.2 Creativity and technology 54

7.3 Historical retrospective 56

7.4 Linking the present to the past 57

7.5 Innovation environment in construction technology and possible way forward 61

Chapter 8 Life cycle design and prefabrication in buildings:A review and case studies in Hong Kong 67

8.1 Introduction 67

8.2 Research methodology 68

8.3 Results and discussion 70

8.4 Conclusions 79

Chapter 9 Construction assessment and long-term prediction of prestressed concrete bridges based on monitoring data 85

9.1 Introduction 85

9.2 Case study 86

9.3 Finite element analysis 90

9.4 Results and discussion 96

9.5 Conclusions 103

Chapter 10 Revised case-based reasoning model development based on multiple regression analysis for railroad bridge construction 109

10.1 Introduction 109

10.2 Current status of cost estimation for railroad-bridge construction in South Korea 110

10.3 Case-based reasoning and genetic algorithm methodology 111

10.4 Estimation of approximate construction cost using case-based reasoning 113

10.5 Conclusion 124

Chapter 11 Preparation of tender documents 127

11.1 General 127

11.2 Letter of invitation to tender 127

11.3 Instructions to tenderers 128

11.4 Conditions of contract 132

11.5 Specifications 132

11.6 Drawings 133

11.7 Bill of quantities/schedule of prices 133

11.8 List of additional information required from the tenderers 133

Chapter 12 Evaluation of tenders and award of contract 138

12.1 Review of tenders 138

12.2 Tenders containing deviations 138

12.3 Adjudication of tenders 139

12.4 Rejection of all tenders 140

12.5 Award of contract 141

Chapter 13 Study of the relationship between procurement duration and project performance in Design-Build projects:comparison between water/wastewater and transportation sectors 146

13.1 Introduction 146

13.2 Background 147

13.3 Research methodology 149

13.4 Results 151

13.5 Discussion of findings 156

13.6 Conclusions 163

Chapter 14 Design management in Design-Build megaprojects:SR 99 Bored Tunnel case study 166

14.1 Introduction 166

14.2 Research methodology 167

14.3 Background 168

14.4 Project design management 177

14.5 Lesson learned to date and conclusions 183

Chapter 15 Cost management on PFI projects 188

15.1 Introduction 188

15.2 Structure of BOT projects 189

15.3 Case study:Nottingham Express Transit(NET)Light Rail 189

15.4 Factors leading to success on BOT projects 191

15.5 Risks and securities 192

15.6 Case study:Sydney SuperDome,Australia 193

15.7 The Private Finance Initiative(PFI) 194

15.8 The role of the cost consultant in PFI/PPP projects 199

15.9 Case study:Stoke-on-Trent Schools,UK 200

15.10 Conclusion 203

Chapter 16 Assessment of expressway construction using Quality Performance Index 207

16.1 Introduction 207

16.2 Quality assessment items 207

16.3 Diagnosis of quality control level through analysis of QPI assessment results 216

16.4 Conclusions 221

三套模拟试卷 224

参考文献 236

购买PDF格式(9分)
返回顶部